Activity
Brixham to St Peter Port
Sailing
2 May 2025
Use the slider to inspect the recorded route point by point.
Time: -
Distance: -
Speed: -
Heading: -
Latitude: -
Longitude: -
Photos
75.6 nm
Distance
14h 13m
Moving time
5.3 kn
Average speed
9.2 kn
Max speed
- Description
- Not a lot of wind on the trip from Brixham to St Peter Port, Guernsey. Mostly just headsail up. An easy crossing of the TSS. A rather large ship was contacted on Ch13 and was happy for us to continue in our role as the "stand on" vessel. Saw the first dolphins of the trip as we passed Berry Head but unfortunately I was on "lobster pot watch" rather than "dolphin watch"!
- Start
- 2 May 2025 at 03:50:04
- End
- 2 May 2025 at 18:44:16
- Participants
- Aidan
- Tags
- CI & France 2025 Fulmar