Activity
Sark to St Peter Port
Sailing
2 Jun 2018
Use the slider to inspect the recorded route point by point.
Time: -
Distance: -
Speed: -
Heading: -
Latitude: -
Longitude: -
Photos
11.8 nm
Distance
3h 25m
Moving time
3.4 kn
Average speed
6.7 kn
Max speed
- Description
- Round from La Greve de la Ville anchorage on the east side of Sark to the Saigne Bay anchorage on the west side. The Saigne Bay anchorage has some rather dramatic rock stacks (think James Bond / The Man With The Golden Gun - but smaller). The on - via the Gouliot Passage and one of the passages north of the Lower Heads cardinal - to St Peter Port marina to meet up with lots of other Starcross Yacht Club "yotties" for the traditional meal in La Perla.
- Start
- 2 Jun 2018 at 09:47:34
- End
- 2 Jun 2018 at 14:50:18
- Participants
- Aidan
- Tags
- CI & France 2018 Fulmar Gouliot Passage Saigne Bay Sark St Peter Port