Activity

Brixham to the Exe

Sailing 21 Jul 2019

Use the slider to inspect the recorded route point by point.

Time: -
Distance: -
Speed: -
Heading: -
Latitude: -
Longitude: -

Photos

19.3 nm Distance
4h 1m Moving time
4.8 kn Average speed
7.2 kn Max speed
Description
Back from Brixham after the Drew Trophy. Another day of ideal winds and we decided to scoot back to the Exe to get in on the falling tide. Some lovely downwind sailing with the cruising chute up much of the way after the Ore Stone. As it was heading towards Springs, there was the usual Exe estuary tides against us on the way in. Back on the mooring with time to spare - time used figuring out how to release the tender from the mooring chain - after it had managed to solidly wrap itself around the chain.
Start
21 Jul 2019 at 10:02:05
End
21 Jul 2019 at 14:40:14
Participants
Aidan
Tags
Brixham Exe SYC

Speed